TAMILNADU ROAD SECTOR PROJECT

CONTRACTS

EPC mode of contracting:

Construction of civil works for widening and upgrading of 427 kms of roads of Core Road Network (CRN) to two-lane with paved shoulders including maintenance for 5 years have been awarded and works are in progress. Out of 10 EPC package works Four package works relating to EPC-01,05,06 & 07 are completed. EPC 08 and EPC 09 two packages are physically completed. The balance EPC package will be completed as per agreement scheduled time period. Regarding EPC 04 package intention to termination notice has been issued to the contractor and the remaining works are in progress. Table – 1 shows the details of works under EPC packages.

Table- 1

Contract

SH No.

Name of the road stretch

Length in km

Agreement amount Rs. in Crore

EPC01

SH116

Upgrading Kanchipuram - Vandavasi Road (SH116) Km 14/300 to km 36/700

( work completed )

22.342

184.98

SH58

Upgrading Sadras - Chengalpattu - Kancheepuram - Arakkonam - Thiruthani Road (SH58) km 0/000 to km 26/811

26.140

EPC02

SH4

Upgrading Arcot - Villupuram Road (SH4) km 29/800 to km 110/165 and km 113/325 to km 114/600

83.075

320.02

EPC03

SH9

Upgrading Cuddalore - Chittoor Road (SH9) km 41/700 to km 44/000 and km 45/000 to km 66/190 and construction of a new link road between SH9 and SH137(km 66/190 to km 71/147)

28.450

95.22

EPC04

SH70

Upgrading Vridhachalam - Parangipettai Road (SH70) km 0/000 to km 35/800

 

35.800

162.41

EPC05

SH86

Upgrading Omalur - Sankari - Thiruchengode - Paramathy road (SH86) km 54/800 to km 81/000 ( Work compeleted)

26.200

103.81

EPC06

SH79

Upgrading Malliyakarai - Rasipuram - Trichengode - Erode Road (SH79) km 0/000 to km 30/600 and km 51/400 to km 71/300

50.525

224.06

EPC07

SH95

Upgrading Mohanur – Namakkal – Senthamangalam - Rasipuram Road (SH95) km 0/000 to km 13/100

( Work Completed)

13.385

63.95

EPC08

SH89

Upgrading Nanguneri - Bharatavaram - Ovari Road (SH89) upto ECR junction km 0/000 to km 35/200

35.200

110.99

EPC09

SH44

Upgrading Paruvakudi - Kovilpatti - Ettayapuram -Vilathikulam - Vembar Road (SH44) km 22/500 to km 38/750 and km 41/300 to km 56/700

31.650

152.97

EPC10

SH41

Upgrading Rajapalayam - Sankarankoil - Tirunelveli Road (SH41) km 1/800 to km 28/000 and km 33/800 to km 82/800

75.200

286.50

 

 

TOTAL

427.967

1704.91

 

 

PPP (Modified Annuity) mode of contracting:

146 Km length of roads are proposed to be widened as four lane with paed shoulders thro’ PPP – mode. Noc has been obtained from World Bank and Tamilnadu Infrastructure Development Board Tenders for PPP-02 & PPP-03 have invited and agreement executed on 23/03/2018 & 28/03/2018 respectively. Pre-construction work for these two packages (PPP-02&03) are in progress. Due to non furnishing of Performance Security Deposit by the awarded contractor the work of PPP-03 has been initiated for Rebid.

Hon’ble High Court vacated the interim stay order for the package no.PPP-01 and the tender will be invited shortly.

 

Package

SH No.

Name of work

Length in km

PPP01

SH 15

Gobi - Erode Road (SH15) km 123/000 to km 153/600

30.60

PPP02

SH 37

Oddanchatram - Dharapuram-Tiruppur Road (SH37) km 37/400 to km 108/400

70.20

PPP03

SH 39

Tirunelveli – Tenkasi Road (SH-39 )km 5/000 to km 50/600

45.64

 

 

Total (PPP works)

146.44

Maintenance through Multi-year Output and Performance Based Road Contract (OPRC)

 

In order to increase the efficiency and effectiveness of road asset management and maintenance, Output and Performance Based Maintenance Contracts (OPRC) have been introduced as an innovative approach. Minimum road conditions and Service Levels are defined based on output and performance measures for which the contractor is responsible.

Roads improved under TNRSP I (Arcot – Tiruvarur and Nagapattinam – Tuticorin) for a length of about 597 km have been entrusted at a cost of Rs.220.00 Crores in two packages for 5 years maintenance period adopting OPRC approach and the works are in progress. The details are as follows.

 

Package

Name of work

Length in km

OPRC-01

Arcot-Tiruvarur Road

265.30

OPRC-02

Nagapattinam -Thoothukudi Road

332.17

 

Total (OPRC works)

597.47

 

  •  Institutional Capacity Enhancement (ICE) and Road Safety.

The implementation of ICE and RS components are being taken up through the newly formed ICERS Cell under the control of Director General, Highways Department.