Welcome to tnrsp   Click to listen highlighted text! Welcome to tnrsp Powered By GSpeech

TAMILNADU ROAD SECTOR PROJECT

CONTRACTS

EPC mode of contracting:

Construction of civil works for widening and upgrading of 427 kms of roads of Core Road Network (CRN) to two-lane with paved shoulders including maintenance for 5 years have been awarded and works are in progress. Out of 10 contracts, 9 were completed on the scheduled time. EPC 04 has been terminated for non compliance to the rate of progress and the tender floated for the balance works on 05.08.2019.

 

Contract

SH No.

Name of the work

Length in km

Cost in cores (Rs)

EPC01

SH116

Upgrading Kanchipuram –Vandavasi Road Km14/300 to km 36/700

( work completed )

22.342

184.98

SH58

Upgrading Sadras - Chengalpattu - Kancheepuram Arakkonam - Thiruthani Road km 0/000 to Km 26/811

26.140

EPC02

SH4

Upgrading Arcot - Villupuram Road km 29/800 to km110/ 165 and km 113 /325 to km 114/600

83.075

320.02

EPC03

SH9

Upgrading Cuddalore – Chittoor Road km 41 /700 to km 44/000 and km 45/000 to km 66/190 and construction of a new link road between SH9 and SH 37 (km 66/190 to km 71/147)

28.450

95.22

EPC04

SH70

Upgrading Vridhachalam - Parangipettai Road km 0/000 to km 35/800

35.800

162.41

EPC05

SH86

Upgrading Omalur - Sankari - Thiruchengode - Paramathy road km 54/800 to km 81/000

26.200

103.81

EPC06

SH79

Upgrading Malliyakarai -Rasipuram-Trichengode - Erode Road km 0/000 to km 30/600 and km 51/400 to km 71/300

50.525

224.06

EPC07

SH95

Upgrading Mohanur – Namakkal – Senthamangalam - Rasipuram Road km 0/000 to km 13/385

13.385

63.95

EPC08

SH89

Upgrading Nanguneri - Bharatavaram - Ovari Road upto ECR junction km 0/000 to km 35/200

35.200

110.99

EPC09

SH44

Upgrading Paruvakudi - Kovilpatti - Ettayapuram -Vilathikulam - Vembar Road km 22/500 to km 38/750 and km 41/300 to km 56/700

31.650

152.92

EPC10

SH41

Upgrading Rajapalayam -Sankarankoil-Tirunelveli Road Km 1/800 to km 28/000 and km 33/800 to km 82/800

75.200

286.50

TOTAL

427.967

1704.91

 

Maintenance through Multi-year Output and Performance Based Road Contract (OPRC) 

Following roads have been taken up for maintenance under OPRC mode for a period of 5 years, maintenance being completed for 3 years.

 

Package

Name of work

Length in km

Cost in cores (Rs)

OPRC-1

Output and performance based road contract for the maintenance of Arcot – Tiruvarur corridor

265.3

94.12

OPRC-2

Output and performance based road contract for the maintenance of Nagapattinam – Tuticorin corridor

314.24

125.96

Total

579.54

220.08

 

 

PPP (Modified Annuity) mode of contracting:

Roads are to be upgraded to four laning for 146.46 km on Design, Build, Finance, Operate, Maintain, and Transfer (DBFOMT) basis on Modified Annuity model which includes 2 years of construction period and 8 years maintenance period in 3 packages viz PPP 01, PPP 02 and PPP 03.

PPP 01:SH15 (30.60 km) – Tender have been floated on 07.08.2019.

PPP 02:SH37 (70.20 km) – For 70.20 km length of Oddancharam to Avinashipalayam road Concession Agreement was signed on 23.03.2018. The work is in progress.

PPP 03:SH39 (45.66 km) – For 45.66 Km length of Tirunelveli to Tenkasi Concession Agreement was signed on 28.03.2018. The Concessionaire had not furnished the performance security and hence the contract was annulled. The approval of the World Bank for procurement plan is awaited.

 

Package

SH No.

Name of work

Length in km

PPP01

SH 15

Gobi - Erode Road (SH15) km 123/000 to km 153/600

30.60

PPP02

SH 37

Oddanchatram - Dharapuram-Tiruppur Road (SH37) km 37/400 to km 108/400

70.20

PPP03

SH 39

Tirunelveli – Tenkasi Road (SH-39)km 5/000 to km 50/600

45.66

Total (PPP works)

146.46

 

 

Institutional Capacity Enhancement (ICE) and Road Safety.

The implementation of ICE and RS components are being taken up through the newly formed ICERS Cell under the control of Director General, Highways Department.

Visitors Count

00142031
Click to listen highlighted text! Powered By TNRSP