EPC mode of contracting:

Construction of civil works for widening and upgrading of 427 kms of roads of Core Road Network (CRN) to two-lane with paved shoulders including maintenance for 5 years have been awarded and works are in progress. Out of 10 contracts, 9 were completed on the scheduled time. For EPC 04 package, Contract terminated on 01.11.2018. Tender for the balance quantity invited and the same has been opened on 30.09.2019. The Tender Evaluation is under process.

 

Contract

SH No.

Name of the work

Length in km

Cost in cores (Rs)

EPC01

SH116

Upgrading Kanchipuram –Vandavasi Road Km14/300 to km 36/700

22.342

184.98

SH58

Upgrading Sadras - Chengalpattu - Kancheepuram Arakkonam - Thiruthani Road km 0/000 to Km 26/811

26.140

EPC02

SH4

Upgrading Arcot - Villupuram Road km 29/800 to km110/ 165 and km 113 /325 to km 114/600

83.075

320.02

EPC03

SH9

Upgrading Cuddalore – Chittoor Road km 41 /700 to km 44/000 and km 45/000 to km 66/190 and construction of a new link road between SH9 and SH 37 (km 66/190 to km 71/147)

28.450

95.22

EPC04

SH70

Upgrading Vridhachalam - Parangipettai Road km 0/000 to km 35/800

35.800

162.41

EPC05

SH86

Upgrading Omalur - Sankari - Thiruchengode - Paramathy road km 54/800 to km 81/000

26.200

103.81

EPC06

SH79

Upgrading Malliyakarai -Rasipuram-Trichengode - Erode Road km 0/000 to km 30/600 and km 51/400 to km 71/300

50.525

224.06

EPC07

SH95

Upgrading Mohanur – Namakkal – Senthamangalam - Rasipuram Road km 0/000 to km 13/385

13.385

63.95

EPC08

SH89

Upgrading Nanguneri - Bharatavaram - Ovari Road upto ECR junction km 0/000 to km 35/200

35.200

110.99

EPC09

SH44

Upgrading Paruvakudi - Kovilpatti - Ettayapuram -Vilathikulam - Vembar Road km 22/500 to km 38/750 and km 41/300 to km 56/700

31.650

152.92

EPC10

SH41

Upgrading Rajapalayam -Sankarankoil-Tirunelveli Road Km 1/800 to km 28/000 and km 33/800 to km 82/800

75.200

286.50

TOTAL

427.967

1704.91

 

Maintenance through Multi-year Output and Performance Based Road Contract (OPRC) 

Following roads have been taken up for maintenance under OPRC mode for a period of 5 years, 4th year Maintenance work is under progress.

 

Package no

Name of the work

Length in km

Cost in crores (Rs)

OPRC-1

Output and performance based road contract for the maintenance of Arcot – Tiruvarur corridor

265.3

94.12

OPRC-2

Output and performance based road contract for the maintenance of Nagapattinam – Tuticorin corridor

314.24

125.96

Total

579.54

220.08

 

 

PPP (Modified Annuity) mode of contracting:

Roads are to be upgraded to four laning for 146.46 km on Design, Build, Finance, Operate, Maintain, and Transfer (DBFOMT) basis on Modified Annuity model which includes 2 years of construction period and 8 years maintenance period in 3 packages viz PPP 01, PPP 02 and PPP 03.

PPP 01:SH15 (30.60 km) – Tender invited and opened on 09.12.2019 and its under scrutiny.

PPP 02:SH37 (70.20 km) – For 70.20 km length of Oddancharam to Avinashipalayam road Concession Agreement was signed on 23.03.2018. The work is in progress.

PPP 03:SH39 (45.66 km) – For 45.66 Km length of Tirunelveli to Tenkasi Concession Agreement was signed on 28.03.2018. The Concessionaire had not furnished the performance security and hence the contract was annulled. Tender has been floated.

 

Package

SH No.

Name of work

Length in km

PPP01

SH 15

Gobi - Erode Road (SH15) km 123/000 to km 153/600

30.60

PPP02

SH 37

Oddanchatram - Dharapuram-Tiruppur Road (SH37) km 37/400 to km 108/400

70.20

PPP03

SH 39

Tirunelveli – Tenkasi Road (SH-39)km 5/000 to km 50/600

45.66

Total (PPP works)

146.46

 

 

World Bank - Additional Loan Proposal & Engaging consultancies for preparing detailed project reports.

The proposal to improve additional 184.573 Km length of roads at a cost of Rs.1660.43Cr have been sent to the World Bank by the DEA to get the World Bank assistance.

Further, preparations of Detailed Project Reports for a length of 3319Km are being taken up under TNIDB fund assistance at a cost of Rs.132.70 Cr.

Out of this 3319 Km, 1181.635 Km length of road have been taken up in first phase in 5 packages viz, PPC 06, PPC 07, PPC08, PPC 09 & PPC 10 and selection of DPR consultancy service for PPC 06 has been completed in which 212.785 Km length of roads have been identified for the World Bank Additional loan. The finalization of consultancy for remaining packages of PPC 07 to PPC 10 are under scrutiny. (The locations of the road for packages PPC 06 to PPC 10 are marked in the separate map).

 

 

Institutional Capacity Enhancement (ICE) and Road Safety.

The implementation of ICE and RS components are being taken up through the newly formed ICERS Cell under the control of Director General, Highways Department.