TAMILNADU ROAD SECTOR PROJECT

CONTRACTS

EPC mode of contracting:

Construction of civil works for widening and upgrading of 427.657 kms of roads of Core Road Network (CRN) to two-lane with paved shoulders including maintenance for 5 years have been awarded. Out of 10 contracts, 9 were completed on the scheduled time. Agreement for EPC 04 balance work has been accepted on 28.07.2020 and works is in progress.

 

Contract

SH No.

Name of the work

Length in km (as Per Agreement)

Cost in cores (Rs)

EPC01

SH116

Upgrading Kanchipuram –Vandavasi Road Km14/300 to km 36/700

22.342

18.4.98

SH58

Upgrading Sadras - Chengalpattu - Kancheepuram Arakkonam - Thiruthani Road km 0/000 to Km 26/811

26.140

EPC02

SH4

Upgrading Arcot - Villupuram Road km 29/800 to km110/ 165 and km 113 /325 to km 114/600

83.075

320.02

EPC03

SH9

Upgrading Cuddalore – Chittoor Road km 41 /700 to km 44/000 and km 45/000 to km 66/190 and construction of a new link road between SH9 and SH 37 (km 66/190 to km 71/147)

28.450

95.22

EPC04

SH70

Upgrading Vridhachalam - Parangipettai Road km 0/000 to km 35/800

35.800

162.41

EPC05

SH86

Upgrading Omalur - Sankari - Thiruchengode - Paramathy road km 54/800 to km 81/000

26.200

103.81

EPC06

SH79

Upgrading Malliyakarai -Rasipuram-Trichengode - Erode Road km 0/000 to km 30/600 and km 51/400 to km 71/300

50.525

224.06

EPC07

SH95

Upgrading Mohanur – Namakkal – Senthamangalam - Rasipuram Road km 0/000 to km 13/385

13.385

63.95

EPC08

SH89

Upgrading Nanguneri - Bharatavaram - Ovari Road upto ECR junction km 0/000 to km 35/200

35.200

110.99

EPC09

SH44

Upgrading Paruvakudi - Kovilpatti - Ettayapuram -Vilathikulam - Vembar Road km 22/500 to km 38/750 and km 41/300 to km 56/700

31.650

152.92

EPC10

SH41

Upgrading Rajapalayam -Sankarankoil-Tirunelveli Road Km 1/800 to km 28/000 and km 33/800 to km 82/800

75.200

286.50

TOTAL

427.967

1704.91

 

Maintenance through Multi-year Output and Performance Based Road Contract (OPRC) 

Following roads have been taken up for maintenance under OPRC mode for a period of 5 years and 5th year Maintenance work is under progress.

 

Package no

Name of the work

Length in km (as Per Agreement)

Cost in crores (Rs)

OPRC-1

Output and performance based road contract for the maintenance of Arcot – Tiruvarur corridor

265.3

94.12

OPRC-2

Output and performance based road contract for the maintenance of Nagapattinam – Tuticorin corridor

314.24

125.96

Total

579.54

220.08

 

 

PPP (Modified Annuity) mode of contracting:

Roads are to be upgraded to four laning for 146.46 km on Design, Build, Finance, Operate, Maintain, and Transfer (DBFOMT) basis on Modified Annuity model which includes 2 years of construction period and 8 years of maintenance period which consists of 3 packages viz PPP 01, PPP 02 and PPP 03.

PPP 01:SH15 (30.60 km) – Tender notice published 20.04.2020 and bid opened on 31.07.2020 and the evaluation is under progress

PPP 02:SH37 (70.20 km) –Concession Agreement was signed on 23.03.2018 and the Estimated Project Cost is Rs.713.45 cr. The work is in progress.

PPP 03:SH39 (45.66 km) – Concession Agreement was signed on 28.03.2018 and the Estimated Project Cost is Rs. 426.20cr. The Concessionaire had not furnished the performance security and hence the contract was annulled. Technical bids for rebid were opened on the 14.02.2020.World Bank has issued NOC to Technical Bid Evaluation Report. Financial bids opened on 27.05.2020 and financial bids evaluation is in progress.

 

Package

SH No.

Name of work

Length in km (as Per Agreement)

PPP01

SH 15

Gobi - Erode Road (SH15) km 123/000 to km 153/600

30.60

PPP02

SH 37

Oddanchatram - Dharapuram-Tiruppur Road (SH37) km 37/400 to km 108/400

70.20

PPP03

SH 39

Tirunelveli – Tenkasi Road (SH-39 )km 5/000 to km 50/600

45.66

Total (PPP works)

146.46

 

 

World Bank - Additional Loan Proposal & Engaging consultancies for preparing detailed project reports.

Preparation of Detailed Project Reports for a length of 3319 Km for an amount of Rs. 132.76 Cr has been sanctioned under TNIDB fund. In the first phase, 1181.635 Km length of roads have been taken up in 5 packages viz PPC 06 to PPC 10. In this, 7 roads having a length of 110.148 km have been selected and finalized for execution under World Bank additional loan assistance. The finalization of consultancy for remaining packages of PPC 07 to PPC 10 is under progress.

 

 

Institutional Capacity Enhancement (ICE) and Road Safety.

The implementation of ICE and RS components are being taken up through the newly formed ICERS Cell under the control of Director General, Highways Department.